Goa Waste Management Corporation
Saligao Plateau, Saligao, Bardez, Goa

Common Hazardous Waste Treatment Storage and Disposal Facility (CHWTSDF) at pissurlem

BRIEF DISCIRPTION 

Goa Waste Management Corporation along with Goa Industries Environmental Management Association has established a Common Hazardous Waste Treatment Storage and Disposal Facility (CHWTSDF) for the State of Goa to dispose the waste that exhibits Corrosivity, Reactivity, Ignitability and having toxic characteristics.
The Hazardous waste generated by industries has to be collected, transported, treated and disposed in Common Hazardous Waste Treatment Storage and Disposal Facility (CHWTSDF) as per Central Pollution Control Board guidelines (HAZWAMS) and shall have strict adherence Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016.
Based on the Supreme Court Directives, Goa Chamber of Commerce floated SPV by name & style of Goa Industrial Environment Management Association (GEIMA) with a mandate to develop a common facility for scientific and environmentally safe disposal of Hazardous waste in the State of Goa. Goa Industries Environment Association (GIEMA) had appointed Ponda Envocare Limited a SPV of M/s. SMS Envocare Limited to set up CHWTSDF. GIEMA has contracted Ponda Envocare Limited and the CHWTSDF facility is operated by Ponda Envocare Limited on BOOT (Build Own Operate Transfer) basis for 25 years and post monitoring for 30 years.
M/s. Paradigm Environmental Strategies Pvt. Ltd. was appointed as consultant for carrying out the Project Management Consultant (PMC) and Auditing services for Common Hazardous Waste Treatment Storage and Disposal Facility at Pissurlem Industrial Estate in Goa State.


Facilities available at Common Hazardous Waste Treatment Storage and Disposal Facility:-
• Secured Land Fill (Stabilization and secured land filling of hazardous waste) of capacity - 25000MT/Annum.
• Hazardous Waste Storage of capacity - 10000 MT.
• Pre-processing followed by co-processing to cement kiln of capacity - 25000MT/Annum.
• Effluent Treatment Plant (ETP) followed by UF& RO of capacity - 85 KLD.
• Multi Effective Evaporate (MEE) of capacity - 100 KLD.
• Rotary kiln-based INCINERATION followed by waste heat recovery boiler (WHRB) & Special liquid waste disposal stream plant of capacity- 1.5MT/Hr.
• Boiler plant Solid fuel based of capacity – 8 Ton/Hr
• WTP plant & RO plant capacity – (600KLD / 200KLD)
Designed and Maintained by Awzpact Technologies & Services Pvt. Ltd.
Last Updated on: July 14, 2025